Zoetermeer , Netherlands
Phone: xxx-xxx-xxxx
Email: xxx@xxxx.xxx
Looking For: engineering manager,
Occupation: Architecture and Engineering
Degree: Master's Degree
Career Level: Experienced
Languages: English and Dutch
Highlights:
Skills:
Engineering manager resume 09/2023 - current
Van Oord, Gorinchem, Netherlands
Industry: Renewable wind energy industry
Experienced engineer with extensive knowledge in oil and gas industrial projects, transitioning into the wind industry with the aspiration to contribute to solving the energy crisis.
• Managed the Hollandse Kust West project, a 1 GW offshore windfarm located 53km west of the Dutch coast, powering about 750,000 households.
• Led a team of 5 engineers and 5 contract and risk management personnel, successfully amending the contract to align with the client’s budget, reducing the project’s risk profile by 15% and bringing the budget down from $380M to $320M.
• Developed a 6-month forecast for engineering activities post-contract signing, providing a clear roadmap for the team.
• Facilitated effective communication between cable suppliers, offshore wind foundation designers, and the client, ensuring smooth information flow.
• Developed the technical solution for a subsea cable transportation and installation tender won in Taiwan for a contract sum of $110m. The deepest cable lay (60m) in the history of the company till date.--
Interface manager 02/2022 - 07/2023
Seaway7, Zoetermeer, Netherlands
Industry: Renewable wind energy industry
Interface management between all stakeholders of a project
• Led interface management team of the Doggerbank project as contractor for client SSE Renewables, a 3.6 GW capacity offshore windfarm located 130km off the north-east coast of the United Kingdom(UK), making it the world’s largest windfarm to date.
• Conducted interface meetings with clients and subcontractors to resolve engineering issues with contractual implications, reducing the risk of project delay by 10%.
• Managed a team of 10 project members, ensuring the project stayed within budget, scope, and schedule. The first 2 project milestones were achieved on time with no liquidated damages.
• Identified opportunities for variation orders across the contract amounting to $10M.
• Organized bi-monthly knowledge-learned sessions to incorporate lessons learned into the current project, ensuring continued profitability.--
Senior project engineer 10/2018 - 04/2021
Sarens, Burgas, Bulgaria
Industry: oil and gas - heavy lift and transport
Project out of 4 countries
• Managed the heavy lift and transport engineering part of the Future Growth Project for client TCO – Tengizchevroil, an expansion of an Oil & Gas refinery in Kazakhstan, the largest project in Saren’s history with a budget of about $1B. It was carried out from 4 countries (UK, Bulgaria, Finland and Kazakhstan)
• Oversaw all site engineering activities for 104 modules at the Burgas Port, constituting 60% of all modules loaded in and out of the port.
• Implemented cargo management procedure improvements, saving the client $60K per day in berthing and demurrage costs.
• Developed an inventory management system to track company assets for easy demobilization during project closure, reducing equipment loss by about 95%.--
Project engineer 02/2016 - 02/2018
ALE heavy lift, Abu Dhabi, United Arab Emirates
Industry: oil and gas - heavy lift and transport
Middle east project
• Managed several land & marine transportation projects simultaneously across the Middle East (UAE, Oman, Qatar, Kuwait, Bahrain) & Africa (Nigeria, Sudan) with largest being EPC2 project – UZ 750 Island. Project budget range from $100K to $10 M. I led a team to install the first pipe rack weighing 2500 tonnes on the EPC2 project
• Implemented an Oracle-based program (IFS) to inventory all company’s assets in the Middle East, enabling engineers to provide accurate equipment lists as per contract.--
Offshore Structural Engineer 01/2015 - 02/2016
Technip, Abu Dhabi, United Arab Emirates
Industry: oil and gas
Design offshore structures.
• Worked on the structural design of 3 jacket platforms in a conceptual FEED (front-end engineering) design study using SACS software on the offshore on Projects worth $600M
• Performed in-place analysis on Utilities platform, one of the 5 platforms for UMM LULU Project worth $1.7B.
• Designed pipe and equipment supports for a gas treatment platform, weighing about 26000 tonnes.
• Managed drawings that were on hold and drawings that were ready for construction by partner company NPCC.--
Offshore Structural Engineer 06/2013 - 08/2014
SBM offshore, Schiedam, Netherlands
Industry: oil and gas
Offshore structural engineering
• Executed blast loading calculations on Topside modules using SESAM software, performed linear structural analysis in Sesam Genie, and conducted static non-linear analysis in USFOS.
• Conducted sensitivity studies on explosion blast loading calculation methods, resulting in reduced necessary steel reinforcement for a safe blast--
Delft university of Technology 09/2006 - 02/2011
Delft, , Netherlands
Degree: Bachelor's Degree
Major:Aeospace engineering
Bachelor of Science in Aerospace Engineering